SBF

Project

Grade separation of intersections on the Km 4 Ring Road, Sfax – Lot No. 2: Intersections RN13 and RN14

Description of the work
Document
Alva Factory image

Grade Separation of Intersections on the Km 4 Ring Road, Sfax - Lot No. 2: RN13 and RN14 Intersections

The project aims to ease and secure traffic flow on the Km 4 ring road at the intersections with national roads RN13 and RN14. Two viaducts were built above these intersections to eliminate direct crossings between the traffic flows of the ring road and those of RN13 and RN14, thus allowing faster and safer vehicle movement from Tunis to Gabès (and vice versa).

Project details
Client:Ministry of Equipment and Territorial Planning
Location:Km 4 Ring Road, Sfax
Project end:2022
Amount:48,900,000 DT
Scope of work:
  • Clearing of sites
  • Earthworks
  • Deep foundation works
  • Sanitation and drainage works
  • Construction of hydraulic structures under the ramps and under each roundabout
  • Construction of two adjacent structures with continuous slab decks in reinforced concrete, each composed of three decks with a total length of 264 m
  • Pavement works and roundabout development
  • Public lighting, signaling, and safety equipment works
Project specifics:

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket