The M’dhila 2 project involves the construction of a new concentrated phosphoric acid production plant at 54%, intended to supply the existing M’dhila 1 plant for triple superphosphate production. The unit includes four main sections and a production line for diluted phosphoric acid, with a daily production capacity of 600 tons of P2O5. It also integrates three phosphoric acid concentration loops at 54% P2O5, each equipped with a fluorine recovery system.