The Lear Corporation TRIM project is a new production unit belonging to the American group Lear Corporation, a world leader in automotive equipment. This plant specializes in the manufacturing and assembly of automotive seat components. The project covers a floor area of ​​18,168 m², incorporating high-precision technical infrastructure as well as specific installations for fluids and electrical networks.

project details
Client: Lear Corporation
Location: Menzel Bourguiba Bizerte, Tunisia
End of project: 2025
Amount:50 910 000 DT
Scope of work:
  • - Civil Engineering: Structural and finishing work, including hollow-core slabs, industrial flooring, prefabricated concrete structures, and steel structures.
  • - Fluids: Installation of special plumbing, heating, ventilation and air conditioning (HVAC) systems.
  • - Electricity: Installation of electrical systems, including power supply, lighting and security systems.
  • - Sprinkler: Installation of an automatic fire suppression system
Spécificité du projet :
  • a large-scale industrial project, completed within ambitious deadlines, incorporating advanced construction technologies and complying with the strict standards of the automotive industry
project duration: 15 Months

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket