The project consists of extending the building housing the National Library of Tunis by adding three main blocks: a storage block dedicated to book storage, a reading block intended for the public with various specialized rooms, and an administrative block housing offices and services.

project details
Client:Ministry of Culture and Heritage Preservation
Location:BLV 9 Avril, Tunis
Project completion:2005
Amount:12,000,000 DT
Scope of work:
  • - Earthworks.
  • - Construction of a general raft foundation between 50 to 100 cm thick for the three blocks.
  • - Construction of the reinforced concrete structure.
  • - Construction of solid slab floors 25 cm thick.
  • - Facade coating works with plaster over an area of 10,000 m².
  • - Installation of marble, stoneware, and tile flooring and wall coverings.
  • - Implementation of acoustic and thermal solutions.
  • - Installation of false ceilings and technical floors.
  • - Painting and interior finishing works.
Key figures:
  • - Area: 25,000 m²
  • - Solid slab surface: 25,000 m²
  • - Excavated material: 85,000 m³
  • - Concrete: 20,000 m³
  • - Reinforcing steel: 2,000 tons
  • - Coating surface: 13,000 m²

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket