The project involves the construction of an office building, consisting of two basements, a ground floor, and eleven floors.
Project Details
Client:SPI ZEINEB
Location:North Urban Center, Tunis
End of Project: 2019
Amount:10 000 000 TND
Scope of Works:
Area: 17,000 m²
Foundation works
Reinforced concrete works (including floor slab structure)
Exterior finishing and façade works
Interior finishing works (partitions, floor and wall coverings, etc.)
Sanitary plumbing works
Electrical works (high and low voltage)
Heating, ventilation and air conditioning (HVAC)
Landscaping and utility networks (roads and various networks)
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant