SBF

Project

OFFICE BUILDING IN THE NORTH URBAN CENTER

Description of the work
Document
Usine Alva image

OFFICE BUILDING IN THE NORTH URBAN CENTER

The project involves the construction of an office building, consisting of two basements, a ground floor, and eleven floors.

Project Details
Client:SPI ZEINEB
Location:North Urban Center, Tunis
End of Project: 2019
Amount:10 000 000 TND
Scope of Works:
  • Area: 17,000 m²
  • Foundation works
  • Reinforced concrete works (including floor slab structure)
  • Exterior finishing and façade works
  • Interior finishing works (partitions, floor and wall coverings, etc.)
  • Sanitary plumbing works
  • Electrical works (high and low voltage)
  • Heating, ventilation and air conditioning (HVAC)
  • Landscaping and utility networks (roads and various networks)

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket