The M’dhila 2 project involves the construction of a new concentrated phosphoric acid production plant at 54%, intended to supply the existing M’dhila 1 plant for triple superphosphate production. The unit includes four main sections and a production line for diluted phosphoric acid, with a daily production capacity of 600 tons of P2O5. It also integrates three phosphoric acid concentration loops at 54% P2O5, each equipped with a fluorine recovery system.

project details
Client:Hyundai & Socomenin, Tunisian Chemical Group
Location:M’dhilla, Gafsa
Project completion:2001
Amount:14,600,000 DT
Scope of work:
  • Section 752: Construction of wet phosphate feeding and storage facilities.
  • Section 721: Construction of phosphate recovery and pulping equipment.
  • Section 720: Installation of attack and filtration systems.
  • Section 722: Installation of the Flash Cooler.
  • Section 725: Construction of the phosphoric acid concentration unit at 54% P2O5.
  • Section 726: Construction of industrial water and cooling networks.
Key figures:
  • Area: 29,175 m²
  • Excavation: 17,104 m³
  • Earthworks: 29,175 m²
  • Concrete: 14,500 m³
  • Reinforcement: 2,700 tons

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket