Transfer of Desalinated Seawater from SDEM ZARAT to Gabes and Southern Tunisia Lot 1

The project consists of constructing the infrastructure for transporting potable water produced by the Zarat desalination plant to the regions of Gabes and southern Tunisia. It includes the supply, transport, installation, and testing of large-diameter pipelines, as well as the construction of essential standard structures for the operation of the transfer network.

Project details
Client:SONEDE
Location:Zarat, Gabes
Project completion:2021
Budget:6,500,000 DT
Scope of work:
  • General earthworks: Preparation of trenches and sites for pipeline and structure installation.
  • Supply and installation of pipes: Installation of DN 800 mm prestressed concrete and ductile iron pipes along the entire route.
  • Pipeline equipment and connections: Installation of valves, joints, manholes, and other accessories necessary for proper network operation.
  • Construction of standard structures: Building specific structures such as high points (for air purging) and low points (for draining).
  • Pipeline testing: Tightness and pressure tests to ensure network integrity.
Key figures:
  • 20,200 meters of DN 800 mm prestressed concrete pipes
  • 1,700 meters of DN 800 mm ductile iron pipes

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant