The project involves the construction of a section of the Médenine - Ras Jedir highway, including a 12 km stretch of highway, the duplication of National Road 1 (RN1) over 12 km, the development of a roundabout, and various structures.
Project Details
Client:TA: Société Tunisie Autoroutes
Location:BEN GUERDANE – RAS JEDIR, MEDENINE
Project Completion:2016
Amount:70,350,000 TND
Scope of Work:
Road construction and development work, including:
- General earthworks: excavation, embankments, and topsoil slope covering
- Construction of roadway layers and shoulders
- Development of a roundabout
- Construction of four crossings
- Construction of 14 box culvert hydraulic structures
- Toll station infrastructure work
- Roadside drainage work: triangular and trapezoidal ditches (in soil and lined)
Key Figures:
Length: 24 km (12 km highway and 12 km duplication of GP1)
Excavation of all types: 111,000 m³
Embankment: 1,510,000 m³
Slope covering with topsoil: 206,000 m²
Box culvert hydraulic structures: 14 structures
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant