This project, which aims to equip the Skhira region with a high-performance industrial unit, involves the construction of a set of industrial structures and service buildings on behalf of TIFERT. This large-scale project aims to establish essential infrastructure for the storage and processing of chemical products, notably phosphoric acid and sulfuric acid. The construction works of this plant include:
- - Basin No. 01: storage basin for 50% and 60% phosphoric acid with a retention area of 126.50 x 62.66 m
- - Basin No. 02: storage basin for 40% phosphoric acid with a retention area of 126.57 x 70.66 m
- - Basin No. 03: storage basin for sulfuric acid with a retention area of 70.4 x 47.2 m
- - Shared control room: floor area including transformer rooms: 1,200 m²
- - Wet phosphate storage silo with a volume of 5,000 m³ (approx. 8,000 tons)
- - Compressed air room: a 336 m² building with metal framework
- - Rooms in the phosphoric building: with concrete structure and slab, masonry walls
- - Neutralization building: area of 360 m²
- - Sandblasting and plastics processing room: area of 225 m²
- - Maintenance workshops: total area approx. 2,650 m²