SBF

Project

RENOVATION OF THE MUNICIPAL SWIMMING POOL OF BELVEDERE IN TUNIS

Description of the work
Document
Alva Factory image

RENOVATION OF THE MUNICIPAL SWIMMING POOL OF BELVEDERE IN TUNIS

The renovation project of the Belvedere Municipal Swimming Pool in Tunis was completed in a very tight 6-month timeframe. It aims to modernize and bring up to standard this historic sports and leisure facility located in the heart of Belvedere Park. The work includes the refurbishment of the pools, modernization of technical installations, rehabilitation of changing rooms and restrooms, improved accessibility, enhancement of surrounding areas, and reinforcement of safety measures. The goal is to quickly deliver a high-quality, comfortable, and safe swimming pool for the residents of Tunis within this constrained time frame.

Project Details
Client:BIAT FOUNDATION
Location:BELVEDERE, TUNIS
Project Completion:2024
Cost:10 000 000 TND
Scope of Work:
  • - Construction of CFA piles for the foundation.
  • - Careful demolition of structures to be removed, preserving existing facades.
  • - Reinforced concrete works.
  • - Prefabrication of bleachers.
  • - Raising of the pool bottom.
  • - Road and utility works (VRD).
  • - Installation of coverings provided by the Client.
  • - Painting and various finishing works.
Project Specificities:
  • - Delicate demolition work to preserve existing walls and architectural character.
  • - Record deadline for project delivery: 6 months.

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket