The project concerns the redevelopment and renovation of the production unit of the Industrial Food Canning Company (SICAM). This project aims to modernize the existing facilities and increase the company's production capacity.
Project details
Client:SICAM: Industrial Food Canning Company
Location:Majaz Al Bab, Beja
Project end:2022
Amount:11,000,000 DT
Scope of work:
Area: 18,000 m²
Earthworks
Reinforced concrete works
Piping works
Roads and utilities (VRD) works
Project specifics:
The main challenge of this project, with a very tight completion deadline of three months, is to strictly respect the delivery date of each structure to allow the installation of equipment and ensure the factory starts up within the allotted time.
Let's build the future, project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant