The project involves the construction of a new brick factory by Poulina Group Holding in the region of Tajerouine, in Kef. This new facility aims to increase the group's brick production capacity.

Project Details
Client:POULINA GROUP HOLDING – BBM Company
Location:Tejerouine, Kef
Project Completion:2024
Amount:43,500,000 TND
Scope of Work:
  • Surface area: 38,000 m²
  • Earthworks
  • Deep Foundation Works (bored piles)
  • Reinforced Concrete Works in Foundation and Elevation
  • Finishing Works including masonry, plastering, coatings
Project Specificities:
  • Structures Requiring Extreme Precision: The project includes the construction of key technical components for a brick factory, namely the kiln, pre-kiln, and dryer. These installations are central to the brick manufacturing process and require highly precise engineering and execution to ensure proper operation and efficiency.

Building the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket