Paving and development of roads derived from the 20 Ramadhan service road
Description of the work
Document
Paving and Development of Roads Connected to 20 Ramadhan Service Road
The project involves paving and developing certain secondary roads branching off from the 20 Ramadhan service road up to Al-Hachan Road, near the southern pedestrian bridge of the ring road (peripheral road).
Project Details
Client: Agency for the Implementation of Housing and Utilities Projects - Tripoli Office
Location: Tripoli, Libya
Project Completion: 2024
Cost: 2,100,000 TND
Scope of Work:
Area: 11,000 m²
Topographic survey & execution study
Construction of wastewater and stormwater networks
Construction of roads including platform preparation, placement of 0/20 granular sub-base, and a bituminous concrete wearing course
Construction of unreinforced concrete sidewalks including curb installation
Public lighting
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant