Haouria GAS PUMPING STATION

Description of the work
Document
Usine Alva image

HAOUARIA GAS PUMPING STATION

The project consists of constructing a compression unit, renewing five existing units, and the general redevelopment of a gas pumping station to ensure the continuous transport of Algerian gas to Italy via subsea pipelines.

project details
Client:Scogat - Snamprogetti
Location:Haouaria, Nabeul
Project completion:2007
Amount:3,000,000 DT
Scope of work:
  • - Construction of reinforced concrete works for the foundations of the compression units.
  • - Construction of pipe supports (pipe racks) with metal frameworks.
  • - Earthworks for pipelines and underground networks.
  • - Installation of electrical and control cables.
  • - Exterior landscaping works.
Project specifics:
  • The complexity of the project lies in the fact that all work was carried out while keeping the station fully operational during the 11 months of construction. This required extreme vigilance and strict coordination.

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant