The project involves roadworks aimed at improving the transport infrastructure in the Bopa region of Benin. The works include road and pavement construction, various utility networks, and the development of intersections and bus stops.
Project Details
Client:Ministry of Equipment and Transport of Benin
Location:Bopa - Benin
Project Completion:2009
Amount:22,000,000 TND
Scope of Work:
- Earthworks involving 300,000 m³ of general excavation
- Installation of 150,000 m³ of lateritic gravel foundation layer
- Construction of a base layer with lateritic gravel stabilized with 4% cement,
treated with a pulvimixer, using 70,000 m³ of laterite and 6,500 tons of cement
- Application of a double-surface bituminous seal coat over a total length of 43,820 linear meters
- Development of seven intersections, including two roundabouts, and bus stops within populated areas
- Special treatment of three marshy zones through the construction of 84 culverts
totaling 6,000 m³ of concrete
- Installation of 10,000 linear meters of covered rectangular gutters
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant