The construction project of the new SAIDA factory at El FEJJA Technopole consists of building a modern and large-scale biscuit factory.
Project details
Client:Tunisian Biscuit Company (SOTUBI)
Location:NEOPARK El Fejja, Manouba
Project completion:2022
Budget:16,000,000 DT
Scope of work:
Area: 22,000 m²
Earthworks
Reinforced concrete works
Finishing works
Waterproofing works
Project specifics:
The main specificity of this project lies in its execution during the COVID-19 pandemic, which required constant adaptation of work methods, team management, and site logistics to comply with health restrictions (social distancing, worker absences due to lockdowns, etc.). Despite these challenges, the project was completed on schedule in January 2022, demonstrating the effectiveness of the methodology employed.
Key figures:
24,000 m³ of concrete
15,000 m² of masonry
40,000 m² of plaster
7,000 m² of waterproofing complex
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant