The project involves the construction of a brick factory in Djebel Oust, a state-of-the-art facility with a production capacity of approximately 1200 tons of fired clay per day.
Project Details
Client:Poulina Group Holding - BBM Company
Location:Djebel El Ouest, Zaghouan
Project Completion: 2019
Amount:13,800,000 TND
Scope of Works:
General earthworks
Utilities and roadworks (VRD)
Reinforced concrete foundations
Reinforced concrete superstructure
Concrete slabs
Prefabricated Laceramic flooring
Prefabricated Laceramic fencing
Masonry fencing
Waterproofing trough
Waterproofing
Coatings
Masonry (red brick and concrete blocks)
Project Specificities:
SBF deployed all its knowledge, skills, tools, and working methods to carry out the complex works of this large-scale project.
Key Figures:
Area: 24,000 m²
Earthworks: 170,000 m³
Poured concrete: 21,000 m³
Asphalt concrete: 39,000 m³
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant