The project involves the construction of a modern clinic (capacity: 100 beds), a building comprising a basement, a ground floor, and six floors.
Project Details
Client:AMEN SANTÉ
Location:Bizerte
Project Completion:2016
Amount:9,000,000 TND
Scope of Work:
Area: 8,500 m²
Earthworks
Soil reinforcement works using "Lutetian wall" method
Main structural works
Masonry and plastering works
Finishing works: false ceilings, floor and wall coverings, interior and exterior joinery, painting
Exterior landscaping and utility networks (roads and various networks)
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant