SBF

Project

Sfax Seawater Desalination Plant

Description of the work
Document
Usine Alva image

Sfax Seawater Desalination Plant

The project involves building a seawater desalination plant in Sfax, Tunisia, with an initial capacity of 100,000 m³/day (expandable to 200,000 m³/day). Led by SONEDE and entrusted to a consortium including ORASCOM, METITO, and COBRA, this major project aims to secure the region’s drinking water supply by tapping into a new non-conventional water source. The works include the seawater intake, the desalination plant, brine discharge, storage and pumping of treated water, as well as supporting infrastructure and utilities. This project is crucial to addressing the water challenges in the Sfax region.

project details
Client:Consortium ORASCOM - METITO - COBRA
Location:Gargour, Sfax
Project completion:2025
Amount:96 550 000 TND
Scope of work:
  • - Civil engineering work for all components of the desalination plant.
  • - Utilities and infrastructure work for all components of the desalination plant.
  • - Construction of maritime structures such as intake towers and ballast blocks.
Key figures:
  • - Area: 80,000 m²
  • - Concrete volume to be used: 60,000 m³
  • - Steel quantity to be used: 8,800 tons
  • - Backfill volume: 120,000 m³
  • - Largest mass concrete pour is for the foundation slab of the seawater pumping station:
    • - Concrete volume: 3,300 m³
    • - Pouring duration: 22 hours nonstop
    • - Slab depth: -14 m
    • - Slab thickness: 1.5 m
    • - Maximum concrete temperature during pouring: < 32°C (despite ambient temperature of 40°C)

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more