FIRST PHASE OF THE RAPID RAILWAY NETWORK OF GREATER TUNIS – LOT NO. 3 – STATION BUILDINGS LINE D

Description of the work
Document
Alva Factory Image

FIRST PHASE OF THE RAPID RAIL NETWORK OF GREATER TUNIS – LOT NO. 3 – STATION BUILDINGS LINE D

Lot No. 3 of the first phase of the Rapid Rail Network (RFR) project in Greater Tunis, specifically for Line D, involves the construction of buildings for the 08 stations on this line connecting Tunis to Gobaa. This lot includes the development of infrastructure for passenger services such as platforms, ticket offices, and waiting areas. It is a key component of the overall RFR project, aimed at modernizing public transport in Greater Tunis by offering a fast, high-capacity alternative to reduce traffic congestion.

project details
Client: Company of Rapid Rail Network of Tunis - RFR
Location: Stations: 1. Essaida Mannoubia, 2. Mellassine, 3. Erraoudha, 4. Bardo, 5. Bortal, 6. Mannouba, 7. Orangers, 8. Gobaa
Project end: 2025
Amount: 42 700 000 TND
Scope of works:
  • - Total covered area of the 8 stations: 16 000 m²
  • - Total covered area of platform shelters: 6 000 m²
  • - Study and execution of works for the construction of the eight (8) stations, including:
    • *Civil engineering
    • *External works (VRD)
    • *Fluid networks
    • *Electricity
    • *Elevators
    • *Fire safety systems
    • *Telephony
    • *Public address systems
    • *Surveillance
Project specifics:
  • - Simultaneous work on 8 separate sites within an active railway zone (maintaining 2 operational tracks).
  • - Strict management required for works involving complex interactions with other lots (Civil Engineering, External Works, Systems, etc.).
  • - Use of appropriate construction methods such as auxiliary decks and Lutetian-type retaining walls.
  • - Strict controls in terms of safety, hygiene, and environment.

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more