The combined cycle power plant is a major project by STEG aimed at efficiently increasing electricity production in Tunisia. The project involves the construction of an industrial complex mainly including the execution of cooling system structures:
Rejection basin and canal
Water cooling circuit (concrete pipe DN 2200 mm, length 1300 m)
Pumping station structure
Electro-chlorination building
Sea water intake structure
Project Details
Client:Tunisian Electricity and Gas Company - STEG
Location:Sidi Abdelhamid, Sousse
Project Completion:2016
Amount:25,300,000 TND
Scope of Work:
Earthworks
Special foundation works
Reinforced concrete structures
Retaining works
Finishing works
Roads and utility networks (VRD)
Let's build the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant