SBF

Project

Combined Cycle Power Plant

Description of the work
Document
Alva Factory image

Combined Cycle Power Plant Radès

The Radès C dual-shaft combined cycle power plant, with a capacity of 450 MW, is a major STEG project aimed at efficiently increasing electricity production in Tunisia. The project involves the construction of an industrial complex mainly including the execution of the following works:

  • Gas turbine.
  • Steam turbine.
  • Pumping station
  • Technical and administrative buildings

Project Details
Client:GAMA
Location:Radès, Ben Arous
Project End:2020
Amount:38,000,000 TND
Scope of Work:
  • Earthworks
  • Special foundation works
  • Reinforced concrete structural works
  • Retaining structures
  • Laying and jacking of concrete pipelines
  • Roads and utilities works (VRD)
Project Specificities:
  • Rigorous Planning: Complex lot division, schedule anticipation, and use of advanced project management tools
  • Complex logistics due to the number of involved stakeholders, requiring strict coordination and flawless organization to ensure smooth operations.
  • Strict hygiene, safety, and environmental requirements
  • Strict quality standards requiring precise execution, testing, and inspections
Key Figures:
  • Concrete Volume: 25,000 m³
  • Steel Quantity: 4,300 Tons
  • Sheet Pile Works: 14,500 m²
  • Length of concrete pipelines: 600 linear meters (diameters 2,000 and 2,800 mm)

Let's build the future project by project

Projects

Stade Olympique
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
Read more
Banque Tuniso-Lybienne
Tunisian-Libyan Bank
SBF completed the construction of the office building for the headquarters of Banque Tuniso-Libyenne BTL.
Read more
Musee-national
National Museum
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
Read more
Clinique-Amen
Amen Clinic
This project consists of a basement, ground floor and 6 floors, it was completed on time and in accordance with the objectives of the project owner.
Read more
Village de Transit
Transit Village
Construction of a village of Arab-Muslim architecture on a total surface area of 11,500 m2, including 9,500 m2 of covered areas.
Read more
Azur city
Azur city
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
Read more
Tunis City
Tunis City
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
Read more
unité d'acide phosphorique
phosphoric acid unit
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant
Read more
Shopping Basket