The project involves the construction of a new brick factory by Poulina Group Holding in the region of Tajerouine, in Kef. This new facility aims to increase the group's brick production capacity.
Project Details
Client:POULINA GROUP HOLDING – BBM Company
Location:Tejerouine, Kef
Project Completion:2024
Amount:43,500,000 TND
Scope of Work:
Surface area: 38,000 m²
Earthworks
Deep Foundation Works (bored piles)
Reinforced Concrete Works in Foundation and Elevation
Finishing Works including masonry, plastering, coatings
Project Specificities:
Structures Requiring Extreme Precision: The project includes the construction of key technical components for a brick factory, namely the kiln, pre-kiln, and dryer. These installations are central to the brick manufacturing process and require highly precise engineering and execution to ensure proper operation and efficiency.
Building the future project by project
Projects
OLYMPIC STADIUM
The largest stadium in Tunisia, with 60,000 seats; SBF produced the entire supporting structure of the stadium, consisting of 64 gantries with a height of 33 metres.
This project is located on the site of the National Museum of Bardo, mainly includes two construction sites which were carried out in parallel and which are
An ambitious architectural work On the banks of the suburbs, the SBF team carried out the major works of the main commercial and leisure center in Tunisia
SBF, the successful bidder for the “Structures” lot of the project (with a deadline of 10 months), proposed and implemented, as a replacement for the traditional solution
The M’dhila project of the new 54% concentrated phosphoric acid production plant with a view to producing triple super phosphate at the existing M’dhila plant