The works consist in carrying out civil engineering works and special tasks (carpentry, electricity, plumbing, etc.) and buried networks of the seawater desalination plant in Djerba with a capacity of 50,000 m3 / day extendable to 75,000 m3 / day. The main achieved works:
- Osmosis building
- Pre-treatment building
- Administration
- Plant pumping
- Distribution networks in High Density Polyethylene (diameter: 315 and 400) and cast iron (diameter: 500-600-800)
- Roads and infrastructure works
- PIC works and seawater intakes