The purpose of this contract is the execution of civil engineering works for the combined-cycle power plant of GHANNOUCH 1 x 400 MW. The project consists in three tasks:
- Civil Engineering
- Electricity
- Metal frame
The Civil Engineering task consists essentially in :
- Earthworks in backfilling and excavation.
- Works relating to the implementation of the foundations of turbines, tarpaulins, tanks and various buildings.
The project includes:
- Turbo-Alternator Foundations
- Steam turbine foundations
- Gas turbine foundations
- Electric building
- Utilities building
- A feed tank
- A Transformer
- Recovery boiler
- Pumping station
- Tanks
- Roads and infrastructure works