Description 1st section

The works relating to this contract consist in:

  • General earthworks: stripping, excavation, backfilling, and disbursement of existing pavement: with an amount of TND 428,462 excluding VAT
  • Roads and sidewalks (2,175,803 TND excluding VAT)
    • 6,000 m3 of anti-contamination sand
    • 14,500 m3 of topsoil foundation layer 0 / 31.5
    • 4,250 m3 of topsoil base layer 0/20
    • 28,000 of reconstituted moistened gravels
    • Treatment and coating of sidewalks
    • Laying 30,000 ml of curbs and sidewalks
    • Covering 16,000 m² in Bituminous Concrete and 40,000 m² in bilayer and topsoil
  • Wastewater networks (587,994 TND excluding VAT)
    • 2,800 ml gravity pipes in PVC DN 400, DN 315, DN 250, precast manholes
    • 2,632 ml delivery pipes in HDPE DN 500 and DN 400.
  • Rainwater networks (605,852 TND excluding VAT)
    • 1,566 ml precast scuppers of section 80*80, 80*60 and 60*60
    • 700 ml gravity pipes in PVC DN 315
    • 270 ml reinforced concrete pipes DN 800, manhole covers and earthenware.
  • Public lighting: (240,234 TND excluding VAT)
  • Various works and signage: Construction of 3 transformer stations and electrical conduit cover works with an amount of 444,228,620 TND excluding VAT

Description 2nd section

Being fully satisfied by the development of the industrial activity park of El Fajja / Manouba – 1st section -, MFCPOLE therefore decided to assign the work of the 2nd section of this park to SBF. All the works executed for this project are complementary two-layer pavement works on a pre-developed site and then an extension including the construction of new sanitation and drainage channels and networks. The works covered by this contract concern:

  • The execution of general earthworks
  • The construction of road networks, including the rehabilitation and finishing of existing roads
  • The execution of rainwater and wastewater networks
  • The installation of public lighting
  • The execution of the electrical conduit cover and construction works of the transformer and signaling stations

Project details

Categories:
Client: MFCPOLE
Location: El Fajja - Manouba
Completed: March 2011
Value: 4,482,575 TND
1st section
End of project : 19 June 2010 -> 18 March 2011
Amount : 4,482,575 TND
2nd section
End of project : 05th November 2012 -> 05th Febrruary 2014
Amount : 7,059,673 TND