Description

The project consists in carrying out the civil works of the combined-cycle power plant in Radès C, 1 x 450 mw:

  • Execution of the gas turbine works.
  • Execution of the steam turbine works.
  • Execution of the pumping station / Shielding work on slurry wall.
  • Execution of technical, administrative, electrical buildings.
  • Concrete quantity: 25,000 m3
  • Steel: 4,300 Tons.
  • Sheet pile works: 14,500 m2.
  • Laying of 600 mL of BONNA Concrete pipes with diameters of 2,000 and 2,800.
  • Pipe sinking of concrete pipes with a diameter of 2,000.
  • Roads and infrastructure works / 6,000 m2 of asphalt

Project details

Categories:
Client: STEG/GAMA/SUMITOMO/MITSUBISHI
Location: Rades - Tunisia
Surface Area: 8,500 m²
Completed: May 2020
Value: 38,000,000 TND